Skip to content

Dasharo Compatibility: Sleep mode

Test cases common documentation

Test setup

  1. Proceed with the Generic test setup: firmware.
  2. Proceed with the Generic test setup: OS installer.
  3. Proceed with the Generic test setup: OS installation.
  4. Proceed with the Generic test setup: OS boot from disk.

SLM001.001 Sleep mode - battery monitoring (Ubuntu)

Test description

This test verifies how quickly the battery discharges while in sleep mode in the OS.

Test configuration data

  1. FIRMWARE = Dasharo
  2. OPERATING_SYSTEM = Ubuntu

Test setup

  1. Proceed with the Test cases common documentation section.

Test steps

  1. Power on the DUT.
  2. Boot into the system.
  3. Log into the system by using the proper login and password.
  4. Charge the battery fully (note: due to the manufacturer's settings the maximum battery charge level is limited to 90%; also, the battery charging process can only be started if the current battery level is less than 80%).
  5. Disconnect the power supply.
  6. Close the lid.
  7. Wake up the DUT in the following timestamps and note the battery level:
    • 1 hour from fully charging,
    • 2 hours from fully charging,
    • 3 hours from fully charging,
    • 6 hours from fully charging,
    • (optional) 24 hours from fully charging.

Expected result

  1. The battery should discharge at a similar rate as in the table below (take the battery wear into account).
Time Battery level
0h 90%
1h 88%
2h 86%
3h 84%
6h 80%
24h (optional) 57%

SLM000.002 Sleep mode - battery monitoring (Windows)

Test description

This test verifies how quickly the battery discharges while in sleep mode in the OS.

Test configuration data

  1. FIRMWARE = Dasharo
  2. OPERATING_SYSTEM = Windows

Test setup

  1. Proceed with the Test cases common documentation section.

Test steps

  1. Power on the DUT.
  2. Boot into the system.
  3. Log into the system by using the proper login and password.
  4. Charge the battery fully (note: due to the manufacturer's settings the maximum battery charge level is limited to 90%; also, the battery charging process can only be started if the current battery level is less than 80%).
  5. Wait 30 seconds for the system to load fully.
  6. Disconnect the power supply.
  7. Close the lid.
  8. Wake up the DUT in the following timestamps and note the battery level:
    • 1 hour from fully charging,
    • 2 hours from fully charging,
    • 3 hours from fully charging,
    • 6 hours from fully charging,

Expected result

  1. The battery should discharge at a similar rate as in the table below (take the battery wear into account).
Time Battery level
0h 90%
1h 79%
2h 69%
3h 58%
6h 26%